The New South Wales (NSW) Government has adopted the Code of Practice: How to safely remove asbestos (2019) under section 274 of the Work Health and Safety Act (the WHS Act) as the standard for proper and safe removal of Asbestos in NSW. This code provides a practical guideline for identifying and managing risks in the workplace and achieving the work health and safety standards required under the WHS Act and WHS regulation. All relevant information regarding asbestos testing can be found at NSW Asbestos Coordination Committee (NACC).
When it comes to the safe removal of asbestos or Asbestos Containing Material (ACM) from a workplace, the following duty holders have a role in managing the risks associated with asbestos removal:
When it comes to the safe removal of asbestos or Asbestos Containing Material (ACM) from a workplace, the following duty holders have a role in managing the risks associated with asbestos removal:
• Person Conducting a Business or Undertaking (PCBU)
• Designers, manufacturers, suppliers, importers, and installers
• Officers
• Workers
• Any other person at the workplace
• Designers, manufacturers, suppliers, importers, and installers
• Officers
• Workers
• Any other person at the workplace
For safe and proper removal of Asbestos, a PCBU must ensure the removal works are carried out by a licenced asbestos removalist unless the WHS Regulation specifies that a licence is not required. Depending on the type and quantity of ACM, the licence required are:
• Class A – can remove any amount of asbestos or ACM including friable asbestos, asbestos-containing dust (ACD) and non-friable ACM
• Class B – can remove any amount of non-friable asbestos or ACM and associated ACD
• No licence required – can remove up to 10 m2 of non-friable asbestos or ACM and ACD associated with the removal of less than 10 m2 of non-friable asbestos or ACM
• Class B – can remove any amount of non-friable asbestos or ACM and associated ACD
• No licence required – can remove up to 10 m2 of non-friable asbestos or ACM and ACD associated with the removal of less than 10 m2 of non-friable asbestos or ACM
Asbestos Inspection and Asbestos testing must be undertaken by a licenced asbestos assessor prior to removal. The steps involved in safe asbestos removal after identification of the ACM will include the following:
• Preparation of an asbestos removal control plan to identify the specific control measures to ensure workers and other people involved within the asbestos removal area is not exposed to asbestos risks, and removal is carried out in a safe manner.
• Displaying warning signs and installing barricades such that access is limited to the asbestos removal area. Any personnel with access to the asbestos removal area must comply with any direction given by the asbestos removalist.
• Wearing the proper Personal Protective Equipment (PPE) and Respirator Protective Equipment (RPE) when working in an asbestos removal area.
• Decontamination of the asbestos removal work area and removed asbestos or ACM before disposal. Wet wipes or rags should be used to remove any dust or debris in the asbestos removal area and to decontaminate the tools and equipment used. Drop sheets should be removed in a safe manner such that no ACM or ACD is left at the removal area. Remove all the asbestos waste including PPE used during removal, all ACM, rags/wipes used for decontamination and drop sheets by placing them in asbestos waste bags and sealing the openings with the help of duct tape. The asbestos waste bags must be labelled as ‘Asbestos Waste’ before disposal.
• Any asbestos waste must be disposed off at a licenced landfill or an authorised asbestos disposal site/facility.
During asbestos removal works, the asbestos removalist must consider the following:
• High-pressure water sprays or compressed air on asbestos or ACM are to be avoided. The asbestos or ACM should be dampened with a constant low-pressure water supply to suppress the possibility of asbestos fibres being airborne;
• Power tools and equipment that can release asbestos fibres or dust in the workplace must be avoided;
• HEPA-filtered H-class industrial vacuum cleaner must be used in the removal area for decontamination. Household vacuum cleaners are never to be used in an asbestos removal area;
• Proper PPE including Respiratory Protection Equipment (RPE) must be used during removal works and until personal decontamination has been completed.
• Power tools and equipment that can release asbestos fibres or dust in the workplace must be avoided;
• HEPA-filtered H-class industrial vacuum cleaner must be used in the removal area for decontamination. Household vacuum cleaners are never to be used in an asbestos removal area;
• Proper PPE including Respiratory Protection Equipment (RPE) must be used during removal works and until personal decontamination has been completed.
After the ACM removal, a clearance inspection should be carried out by a competent person such as a Licenced Asbestos Assessor. A clearance certificate must be issued before the re-occupation of the workplace. Depending on the type of asbestos or ACM removal work, a control or exposure air monitoring might be required to assess the effectiveness of the removal works and the impact on the health of the personnel involved in the asbestos removal works.
It is important to get all asbestos inspection and asbestos testing to be undertaken by a competent consultant such as K2 Consulting Group before the commencement of asbestos removal works.
In the case when bonded asbestos removal is not an immediate necessity depending on the scope of proposed works, an asbestos register might be maintained for future references.